Through the stress - strain adjustment of unit 2, Shiquan Hydropower Station, the thrust bearing pad of unit 2 has been stressed uniformly, and the safe operation of unit 2 is ensured.
通过对石泉电厂2号机组推力轴系的应力—应变调整,使2号机组的推力轴瓦受力均匀,保证了机组的安全稳定运行。
This article presents the repairing work of leaky elastic oil tanks occurred on unit No. 14 of Gezhouba Hydropower Station.
叙述了葛洲坝水电厂14号机组弹性油箱泄漏及处理过程,提出了相应的对策。
With the development of large scale hydropower station and the increase of installed capacity of generating unit, the evaporation cooling has been applied widely.
随着大型水电站的开发建设和单机容量的增大,蒸发冷却将得到广泛的应用。