Tank foundation construction with hot mixed asphalt sand cushion in winter is so affected by weather, environment and temperature that it can not meet design requirement.
冬季储罐基础热拌沥青砂垫层施工,受天气和环境温度影响较大,无法满足设计要求。
Everyone introduced due to the recent hot weather, the construction site to avoid the summer heat during the day, take full advantage from the night time.
大伙介绍,由于近来天气炎热,施工工地为避开白天的酷暑,就充分利用起了夜间时间。
应用推荐