The operating methods of banked fire and hot start-up for 300 MW CFB boiler was introduced, and the points for attention during the operating process were indicated.
介绍300 MW循环流化床锅炉压火、热启动过程的操作方法,指出操作过程中应注意的事项。
The process of buried hot-oil pipeline during start-up is simulated by the way of numerically simulating technology.
对埋地热油管道投产预热过程进行了数值模拟计算。
应用推荐