There are many Planning and Scheduling problems in Steel Manufacturing Enterprise, such as Steel-making Scheduling, Continuous-Casting Planning, Hot Rolling Planning, Logistics Balancing, Transport Scheduling and Integrated Production Scheduling.
基于6个网页-相关网页
Hot Rolling planning is an important activity. It’s an combinatorial optimization problem.
热轧计划编制是钢铁生产中一个重要环节,是一个组合优化问题。
参考来源 - 热轧生产计划优化系统研究与应用·2,447,543篇论文数据,部分数据来源于NoteExpress
The VRPTW model that is suitable to resolve the problems of the production lot planning of the hot rolling strip is suggested.
在分析热轧生产批量计划通用模型的基础上,采用了带有时间窗的车辆路径问题模型。
A special asymmetric vehicle routing problem is presented for modeling the hot rolling lot planning since it accords with the production practice.
本文提出了更为接近热轧批量计划编制实际的特殊不对称车辆路径问题作为热轧批量计划编制问题的数学模型。
The model system of steelmaking-continuous casting-hot rolling integrated production planning is studied, and an integrated production planning model method is suggested.
研究了炼钢-连铸-热轧一体化生产计划编制的模型体系,提出一种一体化生产计划编制模型体系方法。
应用推荐