initial high stress 高地应力
For high in situ stress occurred in Ertan dam area, combined action of initial in situ stress field, time and space effect during excavation and external loads arch thrust etc.
笔者针对二滩电站坝区存在的高地应力现象,从初始地应力场的建立、施工开挖的时空效应,直到与拱推力等外荷载共同作用下对坝基岩体稳定的影响全过程进行了分析和计算。
As the diversion tunnel of Ertan Hydroelectric plant has big dimensions and high initial ground stress, the new conception and method are used in design.
二滩水电站导流隧洞规模大、初始地应力高,设计中采用了现代地下结构设计理论和方法。
Results indicate the local high point height and additional tension stress of rolled strip are proportional to local high point initial height of strip, decrease as rolling reduction ratio increases.
研究结果表明:轧后带钢局部高点高度及附加张应力的大小与来料高点高度成正比,随总轧制压下率的增大而减小。
应用推荐