According the in-situ test and the calculating result of the finite element program, the stress and deformation properties of the culvert with high embankment are studied.
过现场测试结果,并结合有限元计算,研究作用与高填涵洞的受力与变形。
This paper introduces design and test of the pipe used in the circular pipe culvert under high embankment.
介绍了高填方路段圆管涵管节的设计和试验。
By analyzing the loading acted on culvert, it is an effective way to use integral foundation in culvert on high embankment when the separated foundation is limited.
北京市音乐堂改扩建工程采用“两桩托一柱”的方法,转换结构传力体系,实现了基础整体托换,并增设了地下室,充分利用地下空间资源。
应用推荐