The diversion tunnels of the Shuibuya Project feature high head, big discharge, long tunnel line and complicated geologic conditions.
水布垭导流隧洞具有水头高,流量大,洞线长,地质环境差等特点,因而技术问题较多,难度较大。
For large discharge and high head hydropower stations, the selection of energy dissipation mode is an important part for improvement of structure layout and various functions.
大流量高水头水电站泄洪消能型式的选择,是完善枢纽布置和各项功能的重要环节。
The active systems consist of several pumping systems of varying discharge pressure and flow rates, e. g., high head injection system, low head injection system.
能动系统由不同注入压力和流量的泵系统组成,如高压安注系统,低压安注系统。
应用推荐