The experimental results show that the scheduling algorithm based on multiobjective combinational optimization method is better than those heuristic scheduling algorithms.
仿真实验结果表明,基于多目标优化方法的调度算法在多数性能指标上均比启发式调度算法更具优势。
A monolithic model of the lot-sizing and scheduling problem based on the JIT strategy has been proposed in this paper, and a heuristic algorithm using integrated method has been designed to solve it.
文章针对基于JIT思想建立的一种批量计划和作业排序集成问题,建立整体模型,设计了一种启发式算法采用集成方法求求解。
Basing on the combination of heuristic algorithm for assigning tasks and scheduling algorithms for uniprocessor, a novel scheduling algorithm for DCS is proposed in this paper.
在结合启发式任务分配算法和单处理器任务调度算法的基础上,提出了一种分布式控制系统的调度算法。
应用推荐