In the project design of the Dongfeng Hydropower Station, the super thin high double curvature arch dam at the world level has been finally selected according to the continuous optimization design.
东风水电站工程设计中,经过不断的优化设计,最终选用了具有世界水平的超薄高双曲拱坝;
Finally, the algorithm based on slope of relative quantity change has been selected and applied in mass production to improve throughput.
最终在大规模生产中,基于分析相对量变化的斜率的方法被采用并提高了产能。
应用推荐