The design, calculation and construction method for cable crane system, main pylon system, fasten and hang system and anchor system are introduced respectively in this paper.
分别介绍了该缆索吊的缆索系统、主塔架系统、扣挂系统和锚固系统的设计、计算及施工方法。
In the case of inappropriate configuration, problems can occur such as a boot failure, hang, or loss of system access.
如果采用不适当的配置,就会出现引导失败、挂起或系统访问失败等问题。
This could manifest itself as a boot failure, hang, or loss of system access.
这会导致引导失败、挂起或无法访问系统等问题。
应用推荐