The Basel project targeted a particularly sensitive seismic area, and drilled in the middle of a city because of plans to divert steam for heating buildings, another use of geothermal energy.
巴塞尔项目在一个非常敏感的多地震区域施工,而且为了利用地热为建筑供暖,该项目在市中心地区进行钻探。
The advanced technologies such as water source heat pump and double well reinjection used in the geothermal water heating project in the Xiong County of Hebei Province were introduced.
结合成都金沙遗址博物馆地源热泵地下水换热系统工程的施工实践,介绍了选择适宜的管井结构、合理布置抽水井和回灌井、对井口装置进行密闭、二次洗井等施工关键技术。
应用推荐