The application of fuzzy evaluation of blind information in electric network planning.
盲信息的模糊评价模型在电网规划中的应用。
At last, it studies the fuzzy duration-cost optimization of decision network planning.
最后,对模糊决策网络计划工期—成本优化方法进行了探讨。
Proposed an adaptive network fuzzy inference system control strategy based on hierarchy structure of gait planning, which do not require detailed kinematics or dynamic biped models.
提出一种基于步态规划分级结构的自适应网络模糊推理系统控制策略,该方法不需要确定双足机器人运动学和动力学模型。
应用推荐