fuzzy critical path

网络释义专业释义

  模糊关键路径

模糊关键路径

基于1个网页-相关网页

短语

fuzzy critical path method 模糊关键路线法

fuzzy random critical path 模糊随机关键线路

  • 模糊关键路径

·2,447,543篇论文数据,部分数据来源于NoteExpress

双语例句

  • In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).

    本文主要介绍网络计划模糊理论运用时间参数作为模糊变量的计算方法和模糊网络关键线路的确定

    youdao

  • Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.

    基于模糊网络计算方法研究提出新的网络参数计算关键线路判断方法

    youdao

  • At the same time, compute all the path criticalities by utilizing the relationship between the critical path of interval networks and the path criticality of the fuzzy network as well.

    同时利用区间网络关键路径模糊网络关键度关系计算出所有路径关键度。