However, the InfoScreen only needs an update every 60 seconds (as well as a full load of data when it is started up).
然而,InfoScreen只需要每隔60秒进行一次更新(当它刚启动的时候,会对数据作一次完整的加载)。
Each performance test consisted of a ramp-up period, followed by a period with a full user load.
每一个性能测试都由一个过渡时期组成,接着一个全用户负荷时间。
The test program will operate the permanent magnet propulsion motor up to full power (full torque and full load) in a test facility that simulates an actual U.S.Navy DDG-1000 engine room.
测试程序将在一个美海军仿真实际DDG - 1000引擎室的测试设施中操作永磁推进马达至全功率(全扭矩和全负载)。
应用推荐