Because the steel structure installment and the construction restrict mutually, steel frame-core tube structure in construction process causes the whole construction process lag.
钢框架-核心筒结构在施工过程中,由于钢结构安装和土建施工相互制约,致使整体施工进度滞后。
Base on the calculation of an example, suggestions on range of sideway ratio of stories up and down in transfer story of frame-core tube structure with column supporting transfer beam is obtained.
通过实例计算分析,给出了带托柱式转换梁的框架-核心筒结构的转换层上、下层间侧移角比的取值范围建议。
As a high-rise structure, Guangzhou West Tower is composed of a concrete core tube and a special exterior frame which consists of inclining concrete-filled columns.
广州珠江新城西塔是由钢管混凝土斜交网格柱形成的外筒与钢筋混凝土核心筒组成的超高层筒中筒结构体系。
应用推荐