The excavation of deep foundation pit in soft soil region is comprehensive difficulty in geotechnical engineering.
软土地区深基坑开挖是基础和地下工程施工中一个综合性岩土工程难题。
The monitoring plan of retaining structure and surrounding environment during the pit foundation excavation for a complex basement engineering is introduced in this paper.
本文针对地下室工程复杂情况,主要介绍了基坑开挖过程中围护结构及周边环境等监测方案,实测结果与分析。
An engineering example that a deep foundation pit is in dangerous status caused by over excavation in soft clay is described.
介绍一软土地区深基坑由于超挖引起基坑险情的工程实例。
应用推荐