In the construction of tidal power plants, the floating caisson method may reduce the cost shorten the construction period, and improve construction conditions.
在潮汐电站建设中,浮运法施工起着降低造价,缩短工期,改善施工条件等重要作用。
The floating caisson construction method can also be applied to river channel power stations, ports, offshore drilling platforms, subaqueous tunnels, Bridges, locks, etc.
浮运法施工技术在河床式水电站、码头、海上采油平台、过江(海底)隧道、桥梁、水闸等工程中也有广泛的应用前景。
In this article, authors introduce the method of hollow anchor design, construction and experiment in underground engineering anti-floating.
阐述了中空锚杆作为地下工程抗浮措施的设计、施工和试验的方法。
应用推荐