The upward horizontal cut and fill stoping method and the measures for safe mining are recommended.
推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。
This paper introduced a new method for it, ie continuous stoping of room and pillar in stages and to fill mined bed with falling roof by deep-hole blasting.
本文提出了一种矿房矿柱阶段性连续回采,深孔放顶处理空区的采矿方法。
The security of the stoping-cemented fill method is good and the rate of extraction is high. It has made the contribution for mine in technical progress and improving economic benefits.
胶结充填采矿法安全性好、回采率高,为矿山技术进步、提高经济效益起到了积极作用。
应用推荐