As a new factory building is near a old factory building and a new foundation is below a old foundation in the course of extending factory building, using small-sized sinking well is very effective.
在厂房扩建过程中,当新厂房基础与原厂房基础较近,且新基础深于原基础时,采用小型沉井是有效的。
The causation for column foundation settlement of factory building is analysed in this paper' Therefore, the scheme of reinforcing foundation with chemical churning pile has been put up.
分析了某厂房柱基础沉陷事故的原因,提出采用旋喷桩进行加固处理的方案。
The job of foundation leveling, factory bound wall building; scheme and shop drawing designing, the public bidding of the main equipment in domestic and foreign are started.
现正进行土地平整和厂界围墙建设、案设计和施工图设计、内外主体设备招标等项工作。
应用推荐