concrete faced rock-fill dam 混凝土面板堆石坝
faced rock fill dam 面板堆石坝
slab-faced rock-fill dam 混凝土面板堆石坝
concrete faced rock fill dam 砼面板堆石坝
concrete-faced rock fill dam 混凝土面板堆石坝
concrete-faced rock-fill dam 混凝土面板堆石坝
Gongboxia concrete faced rock-fill dam 公伯峡面板堆石坝
Chahanwusu Cncrete Faced Rock-fill Dam 察汗乌苏面板堆石坝
Complete several finite element post-processes of faced rock-fill dam.
3、完成(善)多个面板堆石坝有限元后处理程序。
参考来源 - 高面板堆石坝非线性数值计算及地震响应影响因素研究·2,447,543篇论文数据,部分数据来源于NoteExpress
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
The paper calculates the deformation and the stress of dam body and face for concrete faced rock fill dam with non-linear finite element method and taking Shenzhujiang model as rock fill body model.
文中采用非线性有限元分析方法,并运用沈珠江模型作为堆石体本构模型对面板堆石坝坝体及面板做应力和变形计算。
应用推荐