Specially as a result of the ground water influence, pit dewatering becomes the auxiliary project must be implemented in the deep-pit excavation process .
特别是由于地下水的影响,基坑降水成为深基坑开挖过程中必须实施的辅助工程。
During bank slope excavation in cofferdam in a harbor construction, the work had to be suspended due to water leakage (river water and ground water) into the foundation pit.
某码头工程在采用围堰进行岸坡开挖过程中,受江水和地下水位的影响,基坑内有水渗入导致工程无法进行。