By applying the technique of factor analysis, we can acquire the evaluation result and causes at one time.
同时由于因子分析法的选用,文章在获得评价结果的同时,也可以追溯造成结果的原因。
The steady factor of evaluation set is obtained by the method of Fuzzy Cluster Analysis, then the steady points are separated by the method of Fuzzy Cluster Aalysis.
通过综合评判得到评价集的稳定因素,进而用聚类分析方法分离出这些稳定点。
Fifth chapter introduced the local railway construction project uncertainty factor analysis and the synthetical evaluation.
第五章介绍了地方铁路建设项目不确定因素分析及综合评价。
应用推荐