This paper describes a model for use in predicting cost overruns on engineering design projects.
本文的模型用于预测工程设计费用潜在超支的大小。
Two engineering design projects, practical operation and the calculation method of transformer capacity and start voltage were introduced.
文中介绍了两个工程设计、运行的应用实例,以及变压器容量及起动电压水平的计算方法。
Therefore, it is of considerable necessity to make preliminary attempts and efforts on the research of the influence factors of knowledge management in engineering design projects.
因此,有必要对工程设计项目知识管理影响因素的研究做初步尝试和努力。
应用推荐