... engineering change capability 工程改变能力 engineering change list 工程改变表 engineering change notice 工程改变通知 ...
基于8个网页-相关网页
Change is outside the list of engineering quantity; supplied engineering geology datum and hydro-geological data don't agree with practical condition.
不属于工程量清单范围内的变化,提供的工程地质资料、水文地质资料与实际不符而增加的工程量。
Abstract:First, based on the incomplete contract theory, summarizes the main factors of difference of quantities that including the engineering change, List missing item and quantity deviation.
摘要:首先,基于不完全契约理论,总结引起工程量差异的工程量清单缺项、工程变更等主要因素;
应用推荐