Ballooned Drawing 气球图(爆炸图) Engineering Change Documents 工程更改文件 Dimensional Results 尺寸结果 ..
基于8个网页-相关网页
... Ballooned Drawing 气球图(爆炸图) Engineering Change Documents 工程变更文件 Dimensional Results 尺寸检查结果 ...
基于1个网页-相关网页
Engineering Change Documents if any 如果任何 ; 如有工程变更文件
Engineering Dept. must inform each engineering change with formal documents to Quality Dept. Production Dept. and Material Dept. timely.
每一个工程技术更改必须由技术部以正式的文件及时通知质量,生产,材料部门。
In order to change this situation, software engineering discussion group specifically for providing a software development documents prepared by several norms.
为了改变这种情况,软件工程课题组特意为大家提供了软件开发文件编制的几个规范。
应用推荐