The hyperbolic curve method and the exponential curve method are used to forecast embankment settlement of the highway around Harbin city, meanwhile total embankment settlement is calculated.
采用双曲线和指数曲线两种拟合方法对实测数据进行了曲线拟合计算,同时采用分层总和法对路基总沉降进行了计算。
With the construction of highway developing in the mountains, high filling embankment behind abutment will be inevitably encountered.
随着高等级公路建设在山区的开展,不可避免地会遇到桥头高填路基问题。
The traditional light frame method of slope protection has been widely used in protecting slope and embankment of railway and highway.
传统的轻型框格护坡在铁路、公路的边坡和路堤防护中已经得到广泛应用。
应用推荐