... 热能工程 Thermal Energy Engineering 电力系统及其自 Electric Power System and 动化 Automation ...
基于1个网页-相关网页
If the equipotential connection construction quality is reliable than the safety operation of electric power system and weak -current system can be ensured.
若等电位联结施工质量可靠,就能确保电力系统、弱电系统正常工作、安全运行。
The long distance, high precision time synchronization is very important for SDH communication net, control of electric power system and satellite navigation system, etc.
远距离、高精度的时间同步对SDH通信网、电力系统调控和卫星导航系统等有着极其重要的意义。
XLPE cable is the primary transportation equipment in electric power system and Partial discharge (PD) is the main cause which destroy electric power's cable insulated layer.
XLPE电缆是电力系统中主要的输送电设备。局部放电是造成电力电缆绝缘层破坏的主要原因。
应用推荐