明台产物保险公司 损害防阻 服务简介 明台地震灾损系统应用 (Earthquake Loss System) 计算台湾百年来大地震案例并量化地震风险 ..
基于12个网页-相关网页
Taiwan Earthquake Loss Estimation System 台湾地震损失评估系统
Before the tsunami hit, the cooling system was operated by diesel generators in the plant [to compensate for] a loss of external power sources after the earthquake.
在海啸到来之前,核电站里的冷却系统是由柴油发电机发动的,[为了补偿]地震后外部能源的缺损。
The system is applied to construct a loss assessment model of Tangshan Earthquake.
使用该系统建立了唐山地震灾害损失评价模型。
Long span cable-stayed bridges generally are the key structures of transportation system. Great direct and indirect economic loss will be caused if these bridges getdamaged in an earthquake.
大跨度斜拉桥一般都是交通运输的枢纽工程,一旦在地震中遭到破坏,将会造成巨大的直接和间接经济损失。
应用推荐