The power system short circuit test bench is the important part of the dynamic simulation lab which is one of the "211" project items of our university.
另外电力系统短路实验台是我校“211”工程建设项目——电力系统动态模拟实验室的重要组成部分。
Static lab test and dynamic simulation on neutral water reuse with limestone-concrete treatment, which was used in Weifang Power Plant, Phase II Expansion Project, have been conducted.
针对潍坊电厂二期扩建工程应用石灰-混凝处理法,将中水作为循环水的工艺进行了静态试验室试验和动态模拟试验。
In this article, the dynamic simulation analysis is discussed for the horizontal part design of national "863" plan project "Grass square pavement robot for storm prevention and sand immobilization".
本文运用该方法对863课题“防风固沙草方格铺设机器人”的横向插草机构中的一种方案,即气动插草机构进行了动力学仿真分析。
应用推荐