This system can solve the dynamic schedule problem of two-strand thin slab casting and rolling and optimize production management.
该调度系统可以较好地解决两流薄板坯连铸连轧流程的动态调度问题,进一步优化生产组织。
The system architecture, application program structure design, tasks dynamic schedule strategy and system resource dispatching are presented.
给出了控制系统结构、应用系统结构设计和任务动态调度策略及系统资源分配原则。
And it is considered a effective approach to apply dynamic optimization management and decision with network schedule technique in complex large system project schedule.
指出在复杂大系统工程项目计划中,利用网络计划技术进行动态优化管理与决策是工程项目计划管理与决策的一种有效途径。
应用推荐