Until now the bridge is the longest span in the continuous rigid frame double line railway bridge in our country.
该桥是目前我国最大跨度的预应力混凝土连续刚构铁路双线桥。
Introduces OCS construction transitional plan such as railway line-moving, line-crossing and side-exchanging, bridge and track laying, station closing up etc. on Zhuzhou-Liupanshui double track lines.
介绍了株六复线改造因线路拨移、线路交叉换侧、桥梁铺架、车站封闭等引起接触网施工方案的过渡。
应用推荐