It first builds the model by using curve fitting toolbox to fit the unit input output curves, and then dispatch the load with the aid of optimization toolbox.
首先利用曲线拟合工具箱拟合机组的煤耗特性曲线进行建模,再使用优化工具箱进行负荷优化分配。
At present, in order to dispatch load, lots of hydropower stations need to use the unit efficiency curve, which more or less has some errors because it is obtained by model test.
目前许多电站负荷分配需要使用机组效率曲线,但是由于机组效率曲线是通过模型机得来,在实际运行中难免会有误差。
应用推荐