...变形差 [gap=1513]ords:computer simulation technology; super high-rise building; hybrid structure; different vertical deformation ...
基于8个网页-相关网页
The different vertical deformation occurred in the construction of the super high-rise tower building is one of the most important technical problems.
超高层建筑塔楼施工中存在的较大技术难点是结构竖向变形差的调整。
参考来源 - 超高层混合建筑结构竖向变形差计算分析·2,447,543篇论文数据,部分数据来源于NoteExpress
The different vertical deformation occurred in the construction of the super high-rise tower building is one of the most important technical problems.
超高层建筑塔楼施工中存在的较大技术难点是结构竖向变形差的调整。
While the stiffness of truss stories is huge, and it has great effect on reducing the different vertical deformation of peripheral mega-column and core-wall.
结构中刚度很大的桁架层对减小巨型柱与核心筒之间的竖向变形差作用显著。
In vertical, differential deformation occurred under compressional stress because of different anti-strain capacities in tectonic deformation zones, which result in tectonic variation.
纵向上,因上、下构造变形层抗应变能力的不同,在挤压应力作用下发生差异形变,产生纵向变异;
应用推荐