The design of concrete face rockfill dam's toe slab is a process of iteration and optimization, the final determination of design parameter has finished in the construction process at last.
混凝土面板堆石坝趾板的设计过程是一个迭代与优化的过程,趾板设计参数的最终确定是在施工过程中完成的。
Some problems about the construction, parameter determination and roll profile design of the short thin-walled tube skew roll straightener are discussed in this paper.
本文讨论了薄壁短管斜辊矫直机结构、参数确定和辊形设计中的几个问题。
应用推荐