On the basis of analysing storm flood characteristics of Qinjiang River, the method and main results of design flood calculation for Gaobazhou Project are presented.
在分析清江暴雨洪水特性的基础上,介绍了高坝洲水利枢纽设计洪水计算方法及其主要成果。
The method was adapt broad crested weir theory derivation to calculation flood rate of discharge and conjecture design rate of discharge through field investigate information of bridge.
该计算方法是通过实地调查桥前水深等资料,采用严密的宽顶堰理论推导,求得洪水流量,进而推求设计流量。
The conclusion is: in calculation of design flood in the Weihe River basin, neither reduction of reservoir project impact nor project impact under design conditions can be considered.
结论认为:渭河流域设计洪水计算中,可既不考虑水库工程影响还原,也不考虑设计条件下工程的影响。
应用推荐