Record any uncorrected defects in the project's defect tracking system.
将没有改正的缺陷记录到项目缺陷跟踪系统中。
If the measured value does not meet the requirement under any case, the same is entered into the defect tracking system and tracked to closure.
假如测量值在任何情况下都不符合需求,那么同样要进入缺陷跟踪系统并被跟踪直到终止。
Part 9: system builds and testing; defect tracking; product acceptance.
第9部分:系统构建和测试;缺陷跟踪;产品交付。
应用推荐