Entering new millennium, economic structural reform in our country goes into new critical period, called "deep water period", which requires government transferring function practically, steering well, and enhancing the affects of market, society, law and democracy.
基于1个网页-相关网页
The landside area of the Yangshan deep water port is consisted of large-area high fill soil which is short period project.
洋山深水港区土程陆域系大面积高填土形成,工程周期短。
It was just the peak-period of gas generation in the basin, and gas pressure greatly exceeded water pressure. So, the gas made deep-bed water moved and diffused upwards along faults.
此时也正是盆地生气高峰期,气压远远大于水压,气体推动深层水沿断裂向上扩散。
Combining the practical project, the construction technique of deep water bored pile and key control point during construction period for large bridge are introduced.
结合工程实例,介绍大型桥梁深水钻孔灌注桩施工技术及其施工过程中的关键控制要点。
应用推荐