By analyzing the structural theory calculation, make sure the bridge dead load experiment plan, elaborate the experimental preparation, implementation process and the effect.
通过结构理论计算分析,确定该桥静载试验方案,阐述试验准备、实施过程及所取得效果。
And then the effect of the change of cable length and span and the redistribution of dead load due to deformation on cable curve are analyzed.
分析了索长变化、跨度变化及主缆变形引起的恒载重分布对主缆线形的影响。
The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.
以广州东沙大桥独塔边跨带辅助墩的混合梁双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重、临时荷载、结构刚度、混凝土收缩徐变这些因素对混合梁斜拉桥成桥状态的影响。
应用推荐