The development team that handles the model may be expert at writing DB2 COBOL programs, or EJB entity beans, or some other technology appropriate for storing and manipulating enterprise data.
处理模型的开发小组可以是开发DB 2 COBOL程序、EJB实体bean或适用于存储和操纵企业数据的其他技术的专家。
Finally, the risk assessment model is capable to simulate expert assessment method by verifying the data of IT projects assessment.
最后,通过实际IT项目评价数据的验证,该风险评价模型能够准确地按照专家评价法进行工作。
The system model based on computer aided design and expert system techniques is established through analytical studying on the engineering data of rock drift tunneling.
通过对岩巷掘进工程资料的分析研究,建立了基于辅助设计和专家系统技术的系统模型。
应用推荐