The first missionofthe dissertationis to design NDSP25processor, which is fullycompatiblewith the TI TMS320C25DSP processor in instruction setandcycle timing.
At the same time, however, it is almost impossible to contemplate large projects without debt, nor to smooth over the minor ups and downs of the economic cycle and the timing differences between tax receipts and spending demands.