The compressive strength also varied with the curing time.
养护时间不同,其抗压强度有明显的差异。
Take the average temperature in the curing time as curing temperature.
养护温度取各湿喷桩养护期的平均气温。
Modifying the curing process according to the result of the kinetic study, we are able to reduce the curing time designed by Huang in 2001.
利用反应动力学所得的结果来设计硬化过程所需的温度与时间,可大大缩短黄宏文在2001年时所设计的交联时间。
应用推荐