To speed up the bottom slab construction is the key point for controlling the deformation generally.
加速底板施工是控制底板总变形量的关键。
The main accordance for construction was given and the detail construction proceeding and quality controlling scheme were introduced.
可提高机具等施工效率。给出了施工主要依据,介绍了详细施工程序和质量控制方案。
Therefore, to study the reconsolidation of disturbed soil and its influence on metro tunnel is very useful for controlling the disturbance of construction and the deformation of metro tunnel.
因此,研究扰动土体再固结及其对地铁隧道的影响,对于控制地下工程施工扰动和地铁隧道变形是很有用的。
应用推荐