Calculated from the measured data of continuous beams with shear lag effect of the actual situation, for the future bridge design and construction control of the scene to provide valuable information.
从现场实测数据计算分析连续梁的剪力滞效应的实际情况,为以后的桥梁设计和现场施工控制提供有价值的资料。
The main spans of Hengshan Xiangjiang Bridge in Hunan are cable stayed bridge and continuous beams.
湖南衡山湘江公路大桥主桥斜拉桥和连续梁采用两岸双向顶推施工完成。
The piers of the Bridge are of single-and double-column piers without capping beams and the concrete continuous box girders atop the piers are constructed by movable shuttering form.
研究目的:解决自行式移动模架法现浇客运专线铁路大跨度、大吨位箱梁的关键施工技术、施工工艺,以适应客运专线桥梁的快速施工。