A new method on cost-forecast and optimizing decision-making is built up, aiming at nonlinear problem of fire-electric power set capital construction time limit cost, based on gray system theory.
针对火电机组基建工期成本的非线性问题,基于灰色系统理论,提出了一种成本预测与优化决策的新方法。
参考来源 - 非确定性工程项目计划管理的新方法研究·2,447,543篇论文数据,部分数据来源于NoteExpress
Construction time was slashed from 540 to 390 calendar days.
时间是从540天削减至390天。
This reduces the construction time and nuisances for the neighborhood (noices, dust, etc…).
这减少了施工时间和对于邻居的噪音、灰尘等干扰。
We should work according to the overall schedule chart (the construction time schedule) of the project.
我们应该根据工程项目标总进度表(构筑进度表)工作。
应用推荐