施工技术要求Construction Technical Requirements 因施工地块现已浇注混凝土底板,固采用风镐进行人工开孔,孔距为2.0m~1.5m,呈梅花形布孔,这样有利于浆液充填。
基于10个网页-相关网页
The moisture content of insulation materials in construction should meet the design requirements, technical requirements and construction technical requirements.
保温材料在施工使用时的含水率应符合设计要求、工艺要求及施工技术方案要求。
Abstract: : This paper briefly introduces the characteristics, construction technical requirements and its matters needing attention of Feilumu concrete artistic floor.
摘要: 本文简单介绍了菲鲁姆混凝土艺术地坪的特点和施工的技术要求及注意事项。
Abstract: : this paper introduces a CFG pile composite foundation construction technology, construction technical requirements and construction are the main problems and solutions.
摘要:介绍了CFG桩复合地基的施工工艺、施工技术要求以及施工中存在的主要问题及解决措施。 。
应用推荐