Supplementation and optimization of the original scheme were carried out and thus the construction period was shortened and good economic benefit was achieved.
在原设计方案的基础上,进行了补充和优化,由此缩短施工周期,取得了较好的经济效果,并为类似工程项目提供了施工经验和相关数据。
Finally, the Kuigang tunnel is discussed, which shows that this model is effective for construction scheme optimization and has the value for further study.
实践证明,这种模型很适合大型隧道工程的施工方案优化选择决策。