A planned construction project has been halted to allow a full investigation.
为进行全面调查,规划好的一项建设工程已经停工。
On the basis of full investigation and reasoning, China Eximbank Disaster Preparation Center Construction Project was launched.
在充分调查和论证的基础上,启动了进出口银行灾备中心建设项目。
Based on the investigation on typical construction projects, makes a study on the relationship between decision-making configuration and project performance.
通过对典型项目决策权配置构造的调查和比较,研究建设项目的决策权配置构造与项目绩效之间的关系。
应用推荐