By project case, the paper shows advantages of horizontal directional crossing pipelaying by its construction process and technical requirements.
通过工程实例,介绍水平定向穿越敷管施工工艺和技术要求,借以说明该技术的优点。
Handle a whole team of engineering and the whole design and construction process; ensure new project complies with requirements of quality products, safety, cost and schedule.
管理整个工程团队、相关设计与施工过程控制;确保项目按质量、安全、费用与进度的要求完成。
Suspension Cast-in Situ Beam construction is to control the construction process and bridge state of internal force and linear, so that the bridge State could fully meet the design requirements.
公路悬浇梁施工监控就是控制施工过程中和成桥状态时结构的内力和线形,以使悬浇梁的成桥状态充分满足设计要求。
应用推荐