Through analysis on the main factors that influence project quality in construction process, the effective control methods for project quality in construction period are narrated.
文中通过对施工过程中影响工程质量的主要因素进行分析,阐述了在工程施工阶段过程中,对工程质量进行有效控制的方法。
The main characteristic of water conservancy project is in its investment in large scale, the construction period is longer, high quality control requirement.
水利工程的主要特点在于其投资规模较大,施工周期较长,质量控制要求高。
Through the technology and quality control in the construction period, the effect of anticorrosion and insulation can be effectively enhanced.
通过技术的应用以及施工过程中的质量控制,可以有效提高管道防腐保温的效果。
应用推荐