This paper union sandy soil area drill hole filling pile construction, analysis the hole, the pile quality question because the construction operation does not work.
文章结合砂土地区钻孔灌注桩成孔、成桩施工中,因施工操作不当可能发生孔、桩的质量问题进行分析和探讨。
This is shown in the whole area and its surroundings throughout the processes of design, construction, development and operation.
覆盖于整个园区及周边的设计、建设、开发与运营的全部过程。
Oil field construction troop in overseas operation area production data.
油田施工队伍在国外作业区生产数据。
应用推荐